Structural steel inspection during commercial construction in Edmonton

Inspection That Keeps Pace With Erection

NDT & Inspection for Construction & Engineering

Construction schedules don't wait for inspection — so inspection has to move at construction speed. CIC provides independent testing and inspection for Alberta's builders and engineers: structural steel verification from shop to topping-out, CWB weld acceptance, bolting programs and the paper trail that lets an engineer of record sign without hesitation.

What We Cover on a Building Project

  • Shop fabrication surveillance — dimensional and weld QC while correction is still cheap

  • Field weld inspection — CWB certified acceptance to CSA W59 on erection and repair welds

  • Bolted connections — torque and tension verification documented per connection group

  • Anchor and embed verification — UT and MPI where the structure meets the concrete

  • Existing structures — condition assessment for renovations, change-of-use and remediation engineering

The Testing Methods Construction Projects Buy Most

On a steel package, the method mix is predictable — and knowing it up front keeps inspection off the critical path:

  • Structural weld acceptance → CWB visual inspection to CSA W59, with MPI confirming anything the eye questions

  • Full-penetration welds (moment connections, column splices) → shear wave UT where drawings demand volumetric proof

  • High-strength bolted connections → torque and tension verification, documented per connection group

  • Member conformance → dimensional inspection against shop drawings, in the shop while correction is cheap

  • Suspect or aging steel in renovations → UT thickness for section loss plus MPI crack detection at fatigue details

Built for the EoR Relationship

The engineer of record needs two things from inspection: findings they can trust and documentation they can file. CIC reports deliver both — independent dispositions with no stake in the fabricator's schedule, formatted so review takes minutes. When findings are clean, the project moves; when they're not, the engineer hears it from us first, with data.

Government and Institutional Work Welcome

Public projects add procurement discipline — vendor qualifications, certified personnel records, documentation standards. Those files are ready before they're requested; see our government & infrastructure page for the public-sector specifics.